Solar ATAP or SELCO? Choosing the right scheme for your business

Both let a business use its own rooftop solar. The difference is what happens to the power you do not use.

Aerial view of solar panels on an industrial rooftop

A business installing rooftop solar in Peninsular Malaysia will normally do so under one of two frameworks: Solar ATAP or SELCO (self-consumption). Both are legitimate routes. The right one depends on your size and on how closely your solar output matches your daytime load.

The short version

Solar ATAPSELCO
Main ideaUse your own solar first, export the surplus for bill creditsUse all your solar on site, no export credit
System sizeUp to 100% of your maximum demand, capped at 1 MWacCan exceed 1 MWac, subject to technical assessment
Surplus energyCredited at the average System Marginal Price, within the same monthNot credited
Contract10 yearsNo export contract
Above 1 MWacNot availableStandby charge of RM12 per kWp and a battery storage requirement apply

What changed for SELCO

The Energy Commission revised the SELCO guidelines on 31 December 2025. The standby charge now applies only to systems above 1 MWac, and so does the requirement to install battery storage. Previously the battery requirement started at 72 kWp, which caught many mid-sized factories.

How to choose

Whichever you choose, size the system for self-consumption. Under both schemes, the power you use directly is worth the most.

Scheme rules are set by the Energy Commission and SEDA Malaysia and can change. We confirm the current requirements for your site before any application is submitted.

We'll handle the application either way.

We submit your Solar ATAP or SELCO application and coordinate with the relevant authorities.